Newlands School

 

Newlands School is owned by the Beaconhouse Education Group and opened in the Al Warqa community of Dubai in 2017.

The school follows the national curriculum of England and is licensed in Dubai to operate from FS1 to year 6 currently, expanding to secondary and sixth form in later years. The school has a total capacity of 1100 students.

IDEA ELC
IDEA ELC

Project Summary

The school follows the national curriculum of England and is licensed in Dubai to operate from FS1 to year 6 currently, expanding to secondary and sixth form in later years. The school has a total capacity of 1100 students.

To equip Newlands School, SBS Education supported the pre-operations project, providing ICT procurement, installations and project management services prior to opening. The project was completed effectively and efficiently using our phased approach to New School Projects.

SBS Education believes strongly that ICT is the ‘5th Utility’ in the development of new schools. Alongside electricity, gas, water and telephone systems, schools should expect ICT systems to be just as well-integrated and reliable. ICT is also a utility that directly impacts teaching and learning.

Project Items

Broadband internet
CCTV
Interactive touchscreens
Office 365 for Education
Online backup
PC, laptops & tablets
Server infrastructure
Software


Finance Systems & Support

Phase 1: Site Survey

At an early stage in the school’s pre-operations project, the SBS team carried out a detailed site survey to map out the requirements of the architecture and ensure its ICT delivers world-class connectivity from its opening and for years to come.

A typical survey factors in a day in the life of students and staff in the school to ensure that the ICT Strategy and the practical solutions provided are equally as fitted to the curriculum and school ethos as they are to the architect’s vision of the premises.

With a range of teaching spaces, communal areas and specialist activity facilities, the school boasts the following:

    • 42 standard classrooms
    • Specialist art, media and music rooms
    • A Special Needs base and resource centre
    • 4 science labs with 3 of them as specialist labs (for secondary physics, chemistry and biology) and 1 general lab for primary
    • a multi-purpose hall
    • a 10×20 metre swimming pool with changing facilities plus outdoor football pitch and cricket net
    • 1 library/learning centre and a staff development/training centre
    • External play spaces of more than 1,100 sqm including separate areas for KG, primary and secondary

IDEA ELC

An SBS Site Survey is a full tour of premises with detailed notes of the school architecture


Finance Systems & Support

Phase 2: Plan and Budget

A complete plan was devised to provide a robust foundation to the school’s ICT, prior to the procurement of technology. The detailed plan would facilitate the day-to-day log and updates for the SBS ICT team and the school’s operators during the implementation phase.

To find the most efficient purchasing solution for all items we provided evidence of cost reckoning for each project item.

IDEA ELC

A comprehensive breakdown of project phases


Finance Systems & Support

Phase 3: Procurement

To complete the project within budget the procurement of the infrastructure, hardware and software was conducted thoroughly, ensuring the latest classroom and office technology was purchased at competitive pricing.

Using our depth of knowledge we provided impartial advice on the equipment to suit the school’s current and future needs.

IDEA ELC

The equipment procurement included classroom
technologies such as iPads and interactive touchscreens


Finance Systems & Support

Phase 4: Implementation

The installations were completed with a daily log and update. The school was kept up to date throughout all stages of the project.

The SBS ICT consultant was supported by our wider technical team to complete the many stages of the project in time for opening.

Signficant aspects of the setup included:

Server infrastructure – SBS implemented a market-leading, scalable broadband, firewall for the school that would cater for increased usages as the school student numbers grow. broadband, Wi-Fi points, the server and network cabling

Office 365 for Education – a complete, secure cloud platform for anytime, anywhere access to important files. Key parts of the SharePoint include the Pupil and Parent Area, Admissions and Lesson Plans.

IDEA ELC

Left: Server infrastructure implemented by an experienced ICT engineer supported by the expert SBS team
Right: A detailed, RAG-coded plan
provided a day-to-day progress log


Phase 5: School Opening

Phase 5: School Opening

Upon opening, the school enrolled 250 students and 20 dedicated teachers. With a range of market-leading facilities the school is equipped to expand to secondary and sixth form in later years and provide cross-curricular excellence for new intakes.

A future all-through school, SBS’ ICT Support Service will continue to support Newlands School to maintain and grow its infrastructure in the future.

Visit the Newlands School website →

IDEA ELC

Left: Light, spacious ICT suite with 27 computers
Right: Interactive screen


Find out more about SBS Education

Email info@sbs-edu.com for a free ICT consultation for your school project.

Find out more about our New School Projects service →

Download PDF →

Contact Us






Your privacy is very important to us, read our privacy policy for further details.